Five clauses a CFO should insist on in a battery contract

Updated: 24 hours ago
From our archive: we wrote this note after the week shown above, as part of our back catalogue. For anything newer, see the latest posts in this section.
Updated 17 November 2026: added a payback test on your own generator hours, the 1 January 2027 China rebate date for price clauses, and the CEA safety and cyber rules that start on 1 April 2027.
Before signing a battery contract, a CFO should get five things in writing: how "backup ready" is measured and what you are credited for a miss, how much capacity the battery keeps, how fast faults get fixed, who insures what, and who takes the battery back. For battery health, the Central Electricity Authority's (CEA) 2026 standards give a ready benchmark: at least 90% output after 5 years, 80% after 10 and 70% after 15. And before any of it, rerun the payback on your own generator hours.
The Storage Brief, guide, updated 17 November 2026
Key dates
31 Jul 2026 (notified): CEA Cyber Security in Power Sector Regulations, 2026, in force from 1 April 2027. Power Line
15 Apr 2026 (reported): CEA's 2026 technical standards notified, with the 90/80/70% output curve. Power Line
30 Mar 2026 (notified): CEA battery safety chapter for systems connected above 650 volts published in the Gazette, in force from 1 April 2027. Gazette
Aug 2022 (notified): Battery Waste Management Rules: the producer must see used batteries collected and recycled or refurbished. Source
1 Apr 2021 (in force): IRDAI's standard fire products for businesses take effect. Source
This is general information, not legal advice. Have a lawyer read the final contract.
Before the clauses: does the battery pay at your site?
A contract cannot fix a battery that should not have been bought. Batteries pay at sites that run their generator a lot; sites that rarely do should keep the generator. With last year's logbook, count the hours the battery could have carried (no more than its rated hours per cut), multiply by litres per hour and your invoice diesel price, and subtract the cost of recharging.
Take a 150 kW critical load, a set making 3.2 units a litre, diesel at ₹95.20 (Delhi, PPAC, 16 November 2026) and recharge at ₹8 a unit with 85% round trip (an example). Each generator hour replaced saves about ₹3,051 (our calculation: 150 ÷ 3.2 × ₹95.20 = ₹4,462, less 150 × ₹8 ÷ 0.85 = ₹1,412). At 680 covered hours a year that is about ₹20.7 lakh; at 80 hours, about ₹2.4 lakh (our calculation: 680 × ₹3,051; 80 × ₹3,051). If the annual cost of the battery, bought or paid monthly, sits above your figure, stop here.
1. Availability: what "backup ready" means
"Ready" should mean the system is online, holds the agreed reserve, and can deliver the agreed kW for the agreed minutes, measured from its own logs and reported to you monthly.
If you pay monthly by standing debit, a fault does not stop the payment. So the remedy must be written as a credit on your bill, and you should keep a way out if misses repeat.
Take a monthly charge of ₹1,00,000 and a credit in proportion to hours not ready (an example with a round figure, not a quote). If the battery is down for 36 of a 30-day month's 720 hours, you are owed ₹5,000 (our calculation: 36 ÷ 720 × ₹1,00,000).
A common mistake: a credit that starts only after a 48-hour response window, so a two-day fault costs the supplier nothing.
Questions to paste:
Definition: "How do you define 'backup ready'? Does it include the reserve and the kW and minutes we need?"
Measurement: "Which logs measure it, and will we get a monthly report?"
Remedy: "How much do you credit us for each hour not ready, from the first hour, and after how many misses can we end the contract?"
2. Performance and battery health
The CEA's 2026 technical standards, reported as notified in April 2026, say a battery system must promise at least 90% output after 5 years, 80% after 10 and 70% after 15.
It also asks for depth of discharge (how much of the battery you may use) of at least 80% and round-trip efficiency of at least 70%, Power Line reported. We are not sure it binds a battery behind a site's meter, but it is a ready yardstick.
Take a 400 kWh battery bought to carry 300 kWh of critical load (an example). At the CEA floor it holds 360 kWh at year 5, 320 at year 10 and 280 at year 15 (our calculation: 400 × 0.9, 0.8 and 0.7). It falls 20 kWh short by year 15. Size it bigger or have the supplier top it up.
Questions to paste:
Capacity: "What usable kWh do you promise at handover and at years 5, 10 and 15? Is it at or above the CEA's 90/80/70% curve?"
Cycles: "How many cycles, at what depth of discharge, before the battery reaches that end capacity?"
Testing: "How often is capacity tested, and what happens if it falls short?"
Efficiency: "What round-trip efficiency, AC to AC, do you state?"
3. Maintenance, safety and software
Put service levels in hours and days, not "best efforts". From 1 April 2027 two sets of CEA rules raise the floor:
Safety: above 650 volts, a design safe after two independent failures, automatic fire suppression in every container, and an independent fire safety audit within three months of the rules taking effect, reported to the Electrical Inspector, Energetica India reported.
Cyber: the full rules bind storage of 50 MW and above, Power Line reported. For smaller systems owned by consumers who also generate, vendors must keep monitoring records encrypted in India and allow remote access only over authenticated, encrypted channels, Saur Energy reported.
Questions to paste:
Response: "How many hours from our call to an engineer on site, including Sundays and holidays?"
Repair: "How many days to restore full service, and does the availability clause apply while we wait?"
Safety: "Is the system built to the CEA safety chapter that takes effect on 1 April 2027? Who pays for the fire audit, and before or after switch-on?"
Software: "Where are monitoring records stored? Who can log in remotely? Will you supply security patches for the full term, not just the warranty?"
4. Insurance: who insures what
We found no Indian insurance rule written for batteries. IRDAI's standard fire products, in force since 1 April 2021, include two for businesses:
Bharat Sookshma Udyam Suraksha: the value at risk at one location is up to ₹5 crore.
Bharat Laghu Udyam Suraksha: ₹5 crore to ₹50 crore.
Each carries a standard Agreed Bank Clause. A battery raises the value at risk; if a location crosses ₹5 crore mid-year, the larger product applies at renewal. Write into the contract who buys the cover, for what value, and who is paid in a claim.
Questions to paste:
Ownership: "Who owns the battery during the contract, and who insures it, for what value?"
Policy: "Will the battery be added to our fire policy or to yours? Who is named under the Agreed Bank Clause?"
Claims: "If the battery is damaged, who claims, who repairs, and does our monthly payment pause meanwhile?"
5. End of term: who takes it back
Under the Battery Waste Management Rules, 2022, an energy storage battery is an industrial battery. The producer (the firm that sells it under its own brand, or imports it) must see it collected and recycled or refurbished, and may run a buy-back scheme. The site's duty is to hand the used battery to a collector, refurbisher or recycler. The rules give a used battery no resale value, so price the deal on the backup it buys.
Questions to paste:
Producer: "Who is the producer of this battery under the Battery Waste Management Rules, and what is its registration number?"
Take-back: "At the end of the term, who removes the battery, who pays for removal, and where does it go?"
Options: "Can we extend, buy or return the battery, and at what cost?"
Two lines that sit around the five
Price date: China's 6% battery export rebate ends on 1 January 2027 and its export control pause runs to 10 January. Ask whether the price holds, in rupees, for shipment after December (our note).
Change in law: if a new rule (GRAP, CEA, a tariff change) adds cost, the contract should say who pays.
Red flags
"Backup ready" undefined, or measured with no report to you.
Capacity "as per manufacturer", with no kWh at years 5, 10 and 15.
Insurance left blank, or the battery's owner not named.
No early exit table in rupees for each year of the term.
What to do this week
Pull last year's generator logbook, diesel invoices and 12 months of electricity bills, and run the payback test above.
Paste the questions above into one email to every supplier you are talking to.
Ask your insurer in writing how adding a battery changes your value at risk and your policy.
Questions people ask
Q: What capacity should a business battery keep after 10 years? A: The CEA's 2026 standards ask for at least 80% output at 10 years, 90% at 5 and 70% at 15. Get your supplier's figures in kWh.
Q: Who is responsible for recycling a business battery in India? A: The producer: the firm that sold it under its own brand, or imported it. The site must hand the used battery to a collector, refurbisher or recycler.
Sources
CEA notifies technical standards regulation, 2026. Power Line, 15 April 2026.
CEA (Measures relating to Safety and Electric Supply) Amendment Regulations, 2026. Gazette of India, 30 March 2026.
CEA issues 2026 BESS safety rules, mandates two-fault tolerance and fire audits from April 2027. Energetica India, 14 April 2026.
CEA notifies CEA (Cyber Security in Power Sector) Regulations, 2026. Power Line, 14 August 2026.
CEA's new cyber rules put large renewable and BESS projects under tighter security regime. Saur Energy, August 2026.
China extends rare earth export suspension to January 2027. S&P Global, 9 November 2026.
China to adjust or cancel export tax rebates for photovoltaic and battery products. Henan provincial government, 10 January 2026.
Retail selling price of petrol and diesel in metro cities. PPAC, 16 November 2026.
Guidelines for Standard Products for Fire and Allied Perils. IRDAI, 4 January 2021.
Battery Waste Management Rules, 2022, S.O. 3984(E). Ministry of Environment, Forest and Climate Change, August 2022.
Keep reading
**How a monthly plan works: **Battery backup on a monthly plan: questions sites ask us
**Next guide: **Before you add a battery: a diesel generator checklist for your site
**Safety detail: **CEA battery safety rules: what changes for storage from April 2027
Vaultus puts business batteries on a monthly plan. The battery maker installs and maintains the system, the site pays monthly, and the contract sets how much backup it gets. Send your last 12 months of electricity bills and diesel records to contact@vaultus.io, or run your own numbers with the site calculator.