Before you add a battery: a diesel generator checklist for your site

Writer: Vaultus
Vaultus
Oct 30
7 min read

Updated: 23 hours ago

Updated 17 November 2026: we added how to turn the checklist into one number, the litres a battery could replace each year, plus BEE's overhaul intervals, questions for your service contractor and supplier, and common mistakes.


Before you add a battery, work out one number for every diesel generator on site: the litres a year it burns in cuts that a battery could carry. That number, not the hours on the meter, decides whether a battery pays. To get it, you need three checks: units per litre from a proper trial, fuel bought against fuel burnt, and a logbook split by cut length.


The Storage Brief, guide, updated 17 November 2026


Key dates

  • 21 Oct 2026 (reported): GRAP Stage I invoked across Delhi-NCR, All India Radio reported. Source

  • 29 Sep 2026 (in force): CAQM's revised GRAP, with two generator actions in Stage I. Source

  • 1 Jul 2023 (in force): Tighter emission limits for new genset engines up to 800 kW. Source

  • 3 Nov 2022 (notified): The environment ministry notifies those limits, GSR 804(E). Source


Run the trial the BEE way

Chapter 9 of the Bureau of Energy Efficiency (BEE) guide book, "DG Set System", says to "conduct a 2 hour trial on the DG set" at steady load, with readings "logged at 15 minutes intervals" (section 9.4). The readings it lists include:


  • Fuel: consumption by dip level or flow meter.

  • Electrical: amps, volts, power factor, kW and kWh.

  • Engine and ambient: cylinder-wise exhaust temperature, turbocharger speed, charge air pressure, intake air and cooling water temperatures.


From these you work out loading and units (kWh) per litre. BEE's monitoring table (Table 9.5) lists 22 sets, 21 with readings. Fuel burnt per unit made runs from 0.290 to 0.362 litres, or 3.45 to 2.76 units per litre (our calculation: 1 ÷ 0.290; 1 ÷ 0.362). Every set in it ran at 65% to 110% of derated capacity. It is a monitoring format, not a benchmark, and a backup set at light load will usually sit below it.


On loading, the chapter says engine load "needs to be maintained above 50%", and alternators reach their "highest efficiency attainable at a loading of around 70% and more" (section 9.3).


The checklist (copy this)

  • Set details: make, year, kVA rating, fuel, and the emission standard on the nameplate or type approval certificate. Note any dual-fuel kit or emission control retrofit.

  • Running hours: hour-meter reading now and a year ago, and hours by month.

  • Fuel bought against fuel burnt: litres invoiced, opening and closing tank stock, and litres implied by the set's meter and the trial's units per litre. Explain any gap.

  • Load during cuts: kW from the DG panel or a logger, not the set's rating.

  • Outage log: date, start, end and cause of each cut for 12 months.

  • Cut lengths: hours in cuts up to two hours, and hours in longer cuts.

  • Critical loads: what must stay on (lifts, servers, cold rooms, fire pumps), their kW and how long they need power.

  • Service contract: who services the set, what it costs a year, and the renewal date.

  • Next big spend: overhaul, replacement or a compliance date. BEE's table of typical manufacturer advice gives 3,200 hours between overhauls for a high-speed engine and 8,000 for a slow-speed one.

  • Delhi-NCR: which GRAP band the set falls in (below).


A worked example

Take a Faridabad factory with one 500 kVA diesel set (an example). Over 12 months the log shows 410 running hours and 61,500 units on the set's meter. Invoices show 24,000 litres bought, and tank stock rose by 1,000 litres.


  • Fuel burnt: 23,000 litres (our calculation: 24,000 − 1,000).

  • Units per litre: 2.67, below the lowest set in BEE's table (our calculation: 61,500 ÷ 23,000).

  • Fuel gap: a two-hour trial gives 3.0 units a litre, so the set should have used 20,500 litres. The gap is 2,500 litres, worth ₹2,38,000 at ₹95.20 (our calculation: 61,500 ÷ 3.0; 2,500 × 95.20). Light loading can explain part of it. Leaks, idling or theft can explain the rest.

  • Loading: average load 150 kW (our calculation: 61,500 ÷ 410). Rated at 0.8 power factor, the set gives 400 kW, so it ran at 37.5%, below BEE's 50%.

  • Cost per unit: fuel ₹35.60. A service contract of ₹2,40,000 a year (an example) adds ₹3.90. Total about ₹39.50 a unit (our calculation: 95.20 × 23,000 ÷ 61,500; 2,40,000 ÷ 61,500).

  • Overhaul: at 410 hours a year, a high-speed engine reaches 3,200 hours in about 7.8 years (our calculation: 3,200 ÷ 410). Check where your meter sits now.


Turn the checklist into the number that matters

Now split the 410 hours by cut length (an example): 290 hours in cuts of two hours or less, and 120 hours in 30 longer cuts of about four hours each.


A battery sized for two hours at 150 kW would carry all the short cuts and the first two hours of each long one: 350 hours (our calculation: 290 + 30 × 2). At this set's 2.67 units a litre, that is about 19,634 litres a year, worth about ₹18.7 lakh of diesel (our calculation: 350 × 150 ÷ 2.674; × 95.20).


That is the figure to set against a battery's annual cost, using the daily-running test. If the litres a battery could reach come to a few thousand a year, keep the generator, fix the fuel gap and stop there.


Emission rules to check

New genset engines up to 800 kW must meet the limits the environment ministry notified on 3 November 2022. They apply "from 01-07-2023", SCC Online reported. Record whether each set predates them.


In Delhi-NCR, the Commission for Air Quality Management's GRAP schedule (revision of 29 September 2026) puts two generator actions in Stage I. Action 17: "Ensure that diesel generator sets are not used as regular source of power supply." Action 18 applies CAQM's Direction No. 76 of 29 September 2023 by size:


  • Sets of any size on LPG, natural gas, biogas, propane or butane, and sets up to 800 kW built to GSR 804(E): no restrictions.

  • Older sets of 800 kW and above: any emission control system, subject to the emission standards in Direction No. 76.

  • Older sets of 41 kW to under 800 kW: dual-fuel mode, or emission control devices retrofitted through certified agencies.

  • Older sets of 19 kW to under 41 kW: dual-fuel mode.

  • Portable sets below 19 kW: "not to be generally permitted".


Sets of 19 kW to 41 kW that cannot run dual fuel for lack of gas supply, and portable sets, may serve only prescribed emergency services, such as lifts and hospitals.


Common mistakes

  • Trusting the hour meter alone. Hours without kW and litres say little about cost.

  • Skipping the stock adjustment. Litres bought are not litres burnt if the tank level moved.

  • Testing at an easy load. A trial at 75% load flatters a set that spends its life at 35%. Test near your usual load during cuts as well.

  • Reading the BEE table as a target. Those sets were well loaded. Yours may not be.

  • Ignoring the overhaul date. A big service bill due next year changes the sum.


What to ask your service contractor

  • What units per litre did the last trial show, and at what load?

  • When is the next overhaul due on the hour meter, and what will it cost?

  • Is the set's emission standard, fuel mode or retrofit on record for GRAP checks?


What to ask a battery supplier

  • Which of our cuts, by length, will the battery carry, and which stay on the generator?

  • How many litres a year do you expect it to remove, and from which logbook figures?

  • Who fixes the battery, and who pays if it stops working?


What to do this week

  1. Copy the checklist and fill it in for each generator on site.

  2. Gather 12 months of diesel invoices, tank stock records and the outage log.

  3. Book the two-hour trial for a time when the site can hold a steady load.


Questions people ask

Q: How many units should a diesel generator give per litre? A: BEE's monitoring table shows 2.76 to 3.45 units a litre for sets loaded at 65% or more. A lightly loaded backup set often gives less. Measure yours.


Q: How do I find out if my generator is wasting diesel? A: Compare litres burnt (invoices less any stock rise) with litres the set should need (meter units ÷ trial units per litre). A gap means fuel went missing, or the set runs less efficiently in daily use than in the trial, often because it is lightly loaded.


Q: Are diesel generators banned in Delhi-NCR? A: No. From GRAP Stage I they must not be a regular power source, and older sets need dual-fuel kits or emission controls by size. Some small sets may run only for emergency services.


Q: How do I calculate diesel generator cost per unit? A: Divide litres burnt into meter units, divide the diesel price by that figure, then add service costs per unit. At ₹95.20 a litre and 3 units a litre, fuel alone is about ₹31.73 (our calculation).


Sources


Keep reading


Vaultus puts business batteries on a monthly plan. The battery maker installs and maintains the system, the site pays monthly, and the contract sets how much backup it gets. Send your last 12 months of electricity bills and diesel records to contact@vaultus.io, or run your own numbers with the site calculator.