Three things decide which battery and diesel rules apply to your site: your state, the size of your diesel generator and whether you have solar. If you are in Delhi-NCR and run a diesel generator, the GRAP winter curbs apply now, from Stage I. From 1 April 2027, any battery you add falls under CEA's safety rules, and its supplier under CEA's cyber rules. Pick your state below; each rule links to the issue or source that explains it.



Jump to your state


  • Delhi: GRAP generator curbs now; a monthly power purchase surcharge on the bill.

  • Haryana (Gurugram, Faridabad, Sonipat): GRAP curbs now; tariffs unchanged for 2026-27; no usable time-of-day gap yet.

  • Uttar Pradesh (Noida, Ghaziabad): GRAP curbs now; time-of-day rates for factories only.

  • Rajasthan (Alwar): GRAP curbs now.

  • Other states: Maharashtra, Gujarat, Karnataka, Telangana, Andhra Pradesh, Madhya Pradesh, Chhattisgarh and West Bengal are under State rules below.

  • This week, in NCR: match each generator to the size bands under "If you run a diesel generator", then check how your bill charges demand.


The Storage Brief, guide, updated 17 November 2026


Rules for every business site

  • Time-of-day tariffs for business users above 10 kW (in force, applied by state). The 2023 rules asked states to bring in time-of-day tariffs for business users above 10 kW from April 2024, with peak power at least 1.2 times the normal rate and solar-hour power at least 20% less. States have moved at different speeds; a 2026 draft resets the deadline to 1 April 2027. The wider the gap, the more a battery saves by shifting load. Read more

  • Higher fixed charges for business users (recommendation). CEA wants business users to pay the full fixed cost of supply. If states adopt it, cutting your peak demand with a battery saves more. Read more

  • Battery safety rules (notified). From 1 April 2027, battery installations "connected at voltage level exceeding 650 V" must meet CEA's fire, spacing and audit rules, including an independent fire audit within three months. On our reading this is the AC connection voltage. Systems connected at 650 V or below must meet the listed standards, now in draft. Read more

  • Cyber rules for battery suppliers (notified). From 1 April 2027, vendors of small grid-connected solar and storage owned by consumers who can export must keep monitoring records in India and secure remote access. Owners of 50 MW or more carry the full rules, and their vendors owe them patches for the system's useful life. Read more

  • Battery health benchmark: 80% at year 10 (benchmark). CEA's 2026 standards for grid-scale batteries set at least 80% of rated output after 10 years, from 1 April 2027. They are written for power plants, not site batteries, but they are a fair benchmark: ask your supplier to match it in the warranty. Read more


If you run a diesel generator

  • Five-year diesel generator switch (in force). Sites that use a diesel generator as essential backup are asked to move to cleaner backup, such as batteries, within five years (around April 2027) or by their state commission's timeline. Read more

  • In Delhi and the NCR, the winter curbs depend on size. Portable sets below 19 kW are not generally permitted during GRAP, except for the prescribed emergency services. Older diesel sets of 19 to under 800 kW need dual-fuel mode (19 to under 41 kW) or dual-fuel or a certified retrofit (41 to under 800 kW). A 19 to under 41 kW set that is off dual fuel only because gas is not available may run only for the prescribed emergency services; the schedule gives larger sets no such exception. Sets up to 800 kW built to the 2022 standards have no restrictions. Sets of 800 kW and above need an emission control system that meets the prescribed standards. No set may be a regular source of power. Stages II and III add no generator rule. Source: CAQM GRAP schedule, 29 September 2026. Read more


If you have or plan solar

  • Captive power rules (in force). If your solar is captive or group captive: since 13 March 2026, group companies count as one captive user and captive status is checked once a year. Members that draw more than their ownership share pay surcharges on the excess. Read more

  • Storage with new solar and wind parks (draft). New ground-mounted solar and onshore wind plants commissioned after 1 July 2027 would need storage of 10% of capacity for two hours. The cost may reach your power price. Read more

  • State solar rules on rooftop metering, banking and storage are listed under each state below.


State rules


Delhi

  • Winter diesel curbs (GRAP Stage I) (in force). From the first 'Poor' air days, diesel generators can't be a regular power source. Older diesel sets need dual-fuel mode or a certified retrofit, depending on size. Only small sets (19 to under 41 kW) left off dual fuel because gas is not available, and portable sets below 19 kW, may run for the prescribed emergency services instead. Read more

  • Delhi power purchase surcharge (in force). Delhi bills carry a power purchase surcharge that is reset each month; June 2026's was up to 18.5%. A battery can trim the parts of the bill it is charged on. Read more


Haryana

Sites in the NCR districts, such as Gurugram, Faridabad and Sonipat, also face the Delhi-NCR winter diesel curbs above. In the check, answer yes to the NCR question.


  • 2026-27 tariffs unchanged (in force, as reported). HERC kept retail tariffs unchanged for 2026-27 in its order of 25 March 2026, effective 1 April 2026. Last year's rates carry on. Consumers on prepaid smart meters get a 5% rebate on energy and fixed charges. The Tribune

  • HT industry at 11 kV: ₹6.95 a kVAh plus ₹290 per kVA a month (reported). As reported for the 11 kV supply category, the 2025-26 order raised the energy charge from ₹6.65 a kVAh and the fixed charge from ₹165 per kVA a month. Energy is billed in kVAh, so a poor power factor raises the bill. Each 100 kVA of billed demand costs ₹29,000 a month, or ₹3.48 lakh a year (our calculation: 100 × ₹290, then × 12). A battery saves this only if your bill charges demand on the recorded peak rather than on contract demand. Check the demand line on your bill. ThePrint (PTI)

  • No time-of-day gap to use yet (reported). In its 2026-27 order, HERC found the existing time-of-day tariff "ineffective" and told the DISCOMs to file a fresh, detailed proposal. Until a new scheme is approved, a battery in Haryana earns from the diesel it replaces and the demand it trims, not from shifting load between hours. The Tribune

  • Fuel cost surcharge pending (reported). UHBVNL and DHBVNL have asked HERC to defer and spread recovery of ₹938.86 crore of 2025-26 fuel and power purchase costs, equal to 2.17% of the approved tariff, on a uniform per-unit basis across consumer categories. No order was reported by 30 September 2026. Budget for a surcharge line. SolarQuarter

  • Rooftop solar: year-end surplus at 75% of the SECI rate (draft). HERC's draft second amendment to its 2021 rooftop solar regulations would pay for surplus units left at the end of each April-to-March year at 75% of the last discovered SECI tariff, then reset the balance to zero. We have not seen a final version. Using your own solar, including stored solar, is usually worth more than exporting it. HERC draft

  • Batteries behind the meter (no state rule found). We found no Haryana regulation written for business batteries. The national CEA safety and cyber rules above apply.


Uttar Pradesh

Sites in the NCR districts, such as Noida, Ghaziabad and Meerut, also face the Delhi-NCR winter diesel curbs above. In the check, answer yes to the NCR question.


  • UP time-of-day rates: factories only (in force). Urban factories on LMV-6 and HV-2 pay 15% extra in the evening peak and 15% less at night or early morning. Commercial HV-1 and LMV-2 sites pay the same rate at every hour, so a battery saves on fixed charges and diesel instead. Read more

  • UP fixed charge for large commercial sites (in force). Commercial sites of 75 kW and above on 11 kV pay a fixed charge of ₹430 per kVA a month. Where it is billed on recorded demand, a battery that trims the peak cuts this part of the bill. Read more

  • UP solar policy: duty waiver, no site battery subsidy (policy). Solar power, including captive, is exempt from electricity duty for ten years, and business rooftops get net billing up to 2 MW. The ₹2.5 crore per MW storage subsidy is only for utility-scale projects selling to a DISCOM or UPPCL. Read more


Rajasthan

Sites in the NCR districts, such as Alwar, also face the Delhi-NCR winter diesel curbs above. In the check, answer yes to the NCR question.


  • Rajasthan demand flexibility rules (notified). Rajasthan's 2026 demand flexibility rules don't count diesel generators as a flexibility resource. Read more


Maharashtra

  • Maharashtra storage rule for solar (in force). New renewable projects above 100 kW must carry storage of at least 50% of capacity for two hours. Read more


Gujarat

  • Gujarat battery storage regulations (notified). All grid-connected batteries in Gujarat, including ones a business owns, come under the new rules, including registration. Read more

  • Gujarat six-hour cheap daytime window (in force). Daytime power is cheaper for six hours. A battery can charge in that window and run your evening load. Read more


Karnataka

  • Karnataka time-of-day tariff (in force). From December to June, HT business sites pay ₹1 a unit more from 6am to 9am and 6pm to 10pm, and ₹1 less from 10pm to 6am. Compulsory at 500 kVA and above, optional below. No surcharge or rebate July to November. Read more

  • Karnataka billed demand floor (90% of contract demand) (in force). HT bills charge demand at the higher of the month's recorded peak or 90% of contract demand (₹375 per kVA a month for HT commercial in 2026-27, per the order). A battery saves demand charges only on peaks above that floor. Read more

  • Karnataka rooftop solar rules (DSPV Regulations 2026) (notified). Net metering for all consumers up to sanctioned load or 1,000 kW. Batteries are optional, with a review after two years or at 3 GW. For time-of-day users, surplus solar counts as an off-peak credit, so storing it for evening use is worth more. Read more

  • Karnataka open access rules 2025 (notified). Users of 100 kW or more can buy power from outside their DISCOM. Unused energy can be banked monthly, with a reported 8% banking charge. Read more


Telangana

  • Telangana HT time-of-day tariff (FY 2026-27) (in force). HT sites pay ₹1.50 a unit extra from 6 to 10 am and 6 to 10 pm, and ₹0.50 less from 10 am to 6 pm. No night rebate. HT commercial pays ₹8.80 a unit at 11 kV plus ₹500 per kVA a month. Read more

  • Telangana rooftop solar regulation, 2025 (notified). Commercial and industrial sites can put rooftop solar up to 80% of sanctioned load on net, gross or virtual net metering. Net and gross metered systems are exempt from banking, wheeling and cross-subsidy charges, as reported. Read more

  • Telangana green energy open access (in force). Sites with a load of 100 kW or more can buy green power through open access. Banking is capped at 30% of monthly use, lapses after the month and carries a charge of 8% of the energy banked, as reported. Read more

  • Telangana Clean and Green Energy Policy, 2025 (policy). Plans 3,388 MW of battery storage by FY 2029-30. Storage projects that sell power get stamp duty reimbursement on land and exemption from pollution board consent; battery factories get a 20% capital subsidy, capped at ₹30 crore. Read more


Andhra Pradesh

  • Andhra Pradesh time-of-day tariff (in force). HT factories pay more at 6-10 am and 6-10 pm and less at 10 am-3 pm and midnight-6 am (at 11 kV, ₹7.80 and ₹5.55 against ₹6.30 in high-demand months). HT commercial sites pay ₹1 extra from 6-10 pm, with no cheaper window, and are billed on at least 80% of contract demand. Read more

  • Andhra Pradesh battery storage regulations (notified). Any consumer can add a battery behind its meter, of any size, without DISCOM permission. It must tell the DISCOM before commissioning and meet CEA standards. Grid-connected projects must be at least 1 MW for two hours at 11 kV or above. Read more

  • Rooftop solar metering and battery export rate (in force). Net metering up to 500 kW, net billing up to 1,000 kW, gross metering up to 5,000 kW. On time-of-day tariffs, net-metered exports offset only off-peak use. HT gross-metered solar with a battery supplying at peak earns ₹4.17 a unit. Read more

  • Green open access banking limits (notified). Banked green power is settled monthly by time-of-day slot and capped at 30% of your monthly DISCOM purchase; the excess lapses. Power banked in off-peak hours can only be drawn in off-peak hours. Read more


Madhya Pradesh

  • Madhya Pradesh evening surcharge and solar-hour rebate (in force). HT users and LT business users above 10 kW pay 20% more for energy from 6 to 9 am and 5 to 10 pm, and 20% less from 9 am to 5 pm: a ₹3.26 a unit gap for an HT office on 11 kV. Read more

  • Madhya Pradesh 90% billing-demand floor (in force). HT fixed charges are billed on actual maximum kVA or 90% of contract demand, whichever is higher. A battery that trims the peak cuts fixed charges only down to that floor; below it, contract demand has to come down too. Read more

  • Madhya Pradesh 30% banking cap for green open access (in force). Green open access buyers can bank at most 30% of their monthly DISCOM consumption, and banking follows the tariff's peak and off-peak periods. Surplus above the cap is where a battery helps. Read more


Chhattisgarh

  • Chhattisgarh 5% storage proposal (draft). New distributed renewable projects above 5 MW commissioned from 1 April 2027 would need two-hour storage of 5% of capacity, plus 20% of any captive capacity above contract demand. Banking would carry time-of-day charges. Read more


West Bengal

  • West Bengal demand charge on recorded peak (in force). WBSEDCL high-voltage sites pay ₹384 per kVA a month on recorded demand. Each 100 kVA a battery cuts from the monthly peak saves about ₹38,400 a month, if it catches every peak. Read more

  • West Bengal time-of-day tariff option (in force). HV sites can choose time-of-day rates. An 11 kV commercial site pays ₹9.99 a unit from 5pm to 11pm and ₹3.82 from 11pm to 6am in summer, a ₹6.17 gap a battery can use. Read more

  • West Bengal rooftop solar rules 2025 (in force). Net metering from 1 kW to 500 kW, and net billing or gross metering up to contract demand. WBSEDCL pays ₹3.89 a unit for HV exports in 2025-26, so storing solar for own use is usually worth more. No battery requirement. Read more

  • West Bengal green tariff and green open access (in force). Sites can buy green power from WBSEDCL at 50 paise a unit over the normal tariff, for at least 25% of use for six months. Green open access is open to users of 100 kW or more. Read more


This is a guide, not legal advice. Status words follow the source: notified or in force means final; draft means proposed; reported means we read it in the press, not the order; policy means a government policy rather than a binding rule; benchmark means a standard written for another kind of project. Check the source in each issue before you act.


What changed, by date


What we don't know yet

  • Whether any state commission will set its own date for the diesel generator switch.

  • When Haryana's DISCOMs will file a new time-of-day proposal, and what gap it will set.

  • Which drafts will be finalised as written, and when.

  • How strictly each rule will be checked at small sites.


Questions people ask

Q: Which rules apply to a business battery in India from April 2027? A: Three CEA rules start on 1 April 2027: the battery safety chapter for installations connected above 650 V, the cyber security rules, which bind battery suppliers, and CEA's technical standards for grid-scale batteries, a useful benchmark for site warranties. A 2026 draft also resets the time-of-day tariff deadline for business users above 10 kW to that date.


Q: Do I have to replace my diesel generator? A: Not by a fixed date yet. A 2022 rule asks sites to move to cleaner backup within five years or by their state's timeline. In Delhi and the NCR, older diesel sets need dual fuel or a certified retrofit, by size. The emergency-services exception covers only 19 to under 41 kW sets with no gas supply, and portable sets below 19 kW.


Q: Does Haryana have a time-of-day tariff for industry? A: HERC found the existing time-of-day tariff ineffective in its 2026-27 order and asked the DISCOMs for a fresh proposal, as reported. For now, a battery in Haryana pays mainly by replacing diesel and trimming billed demand.


Q: Which states does the check cover? A: Delhi and the NCR, Haryana, Uttar Pradesh, Rajasthan, Maharashtra, Gujarat, Karnataka, Telangana, Andhra Pradesh, Madhya Pradesh, Chhattisgarh and West Bengal, plus the national rules that apply everywhere.


Sources


Keep reading


Vaultus puts business batteries on a monthly plan. The battery maker installs and maintains the system, the site pays monthly, and the contract sets how much backup it gets. Send your last 12 months of electricity bills and diesel records to contact@vaultus.io, or run your own numbers with the site calculator.