Which battery and diesel rules apply to my site? A quick check for India
Updated: 3 days ago
Business sites in the states we cover face between four and eleven rules on batteries, diesel generators, solar and time-of-day tariffs. Which ones apply depends on three things: your state, the size of your diesel generator and the size of your solar. Pick yours in the check below, or read the lists that follow. Each rule links to the issue or state guide that explains it, with the primary source.
The Storage Brief, guide, updated 1 November 2026
Rules for every business site
Time-of-day tariffs for business users above 10 kW (in force, applied by state). The 2023 rules asked states to bring in time-of-day tariffs for business users above 10 kW from April 2024, with peak power at least 1.2 times the normal rate and solar-hour power at least 20% less. States have moved at different speeds; a 2026 draft resets the deadline to 1 April 2027. The wider the gap, the more a battery saves by shifting load. Read more
Higher fixed charges for business users (recommendation). CEA wants business users to pay the full fixed cost of supply. If states adopt it, cutting your peak demand with a battery saves more. Read more
Battery safety rules (notified). From 1 April 2027, batteries connected above 650 volts must meet the new fire, spacing and audit rules. Smaller systems must meet the listed standards, now in draft. Read more
Battery health benchmark: 80% at year 10 (benchmark). CEA's 2026 standards for grid-scale batteries set at least 80% of rated output after 10 years, from 1 April 2027. They are written for power plants, not site batteries, but they are a fair benchmark: ask your supplier to match it in the warranty. Read more
If you run a diesel generator
Five-year diesel generator switch (in force). Sites that use a diesel generator as essential backup are asked to move to cleaner backup, such as batteries, within five years (around April 2027) or by their state commission's timeline. Read more
In Delhi and the NCR, the winter curbs depend on size. Portable sets below 19 kW are not generally permitted during GRAP, except for listed emergency services. Older diesel sets of 19 to 800 kW need dual-fuel mode (19 to 41 kW) or dual-fuel or a certified retrofit (41 to 800 kW). Sets built to the 2022 standards have no restrictions. Sets of 800 kW and above need an emission control system that meets the prescribed standards. Source: CAQM GRAP schedule, 29 September 2026. Read more
If you have or plan solar
Captive power rules (in force). If your solar is captive or group captive: since 13 March 2026, group companies count as one captive user and captive status is checked once a year. Members that draw more than their ownership share pay surcharges on the excess. Read more
Storage with new solar and wind parks (draft). New ground-mounted solar and onshore wind plants commissioned after 1 July 2027 would need storage of 10% of capacity for two hours. The cost may reach your power price. Read more
State solar rules on rooftop metering, banking and storage are listed under each state below.
State rules
Delhi
Winter diesel curbs (GRAP Stage I) (in force). From the first 'Poor' air days, diesel generators can't be a regular power source. Older diesel sets need dual-fuel mode or a certified retrofit, depending on size, or may run only for listed emergency services. Read more
Delhi power purchase surcharge (in force). Delhi bills carry a power purchase surcharge that is reset each month; June 2026's was up to 18.5%. A battery can trim the parts of the bill it is charged on. Read more
Haryana
Sites in the NCR districts, such as Gurugram, Faridabad and Sonipat, also face the Delhi-NCR winter diesel curbs above. In the check, answer yes to the NCR question.
We haven't yet reviewed this state's own tariff and storage rules; the national rules above apply.
Uttar Pradesh
Sites in the NCR districts, such as Noida, Ghaziabad and Meerut, also face the Delhi-NCR winter diesel curbs above. In the check, answer yes to the NCR question.
UP time-of-day rates: factories only (in force). Urban factories on LMV-6 and HV-2 pay 15% extra in the evening peak and 15% less at night or early morning. Commercial HV-1 and LMV-2 sites pay the same rate at every hour, so a battery saves on fixed charges and diesel instead. Read more
UP fixed charge for large commercial sites (in force). Commercial sites of 75 kW and above on 11 kV pay a fixed charge of ₹430 per kVA a month. Where it is billed on recorded demand, a battery that trims the peak cuts this part of the bill. Read more
UP solar policy: duty waiver, no site battery subsidy (policy). Solar power, including captive, is exempt from electricity duty for ten years, and business rooftops get net billing up to 2 MW. The ₹2.5 crore per MW storage subsidy is only for utility-scale projects selling to a DISCOM or UPPCL. Read more
Rajasthan
Sites in the NCR districts, such as Alwar, also face the Delhi-NCR winter diesel curbs above. In the check, answer yes to the NCR question.
Rajasthan demand flexibility rules (notified). Rajasthan's 2026 demand flexibility rules don't count diesel generators as a flexibility resource. Read more
Maharashtra
Maharashtra storage rule for solar (in force). New renewable projects above 100 kW must carry storage of at least 50% of capacity for two hours. Read more
Gujarat
Gujarat battery storage regulations (notified). All grid-connected batteries in Gujarat, including ones a business owns, come under the new rules, including registration. Read more
Gujarat six-hour cheap daytime window (in force). Daytime power is cheaper for six hours. A battery can charge in that window and run your evening load. Read more
Karnataka
Karnataka time-of-day tariff (in force). From December to June, HT business sites pay ₹1 a unit more from 6am to 9am and 6pm to 10pm, and ₹1 less from 10pm to 6am. Compulsory at 500 kVA and above, optional below. No surcharge or rebate July to November. Read more
Karnataka billed demand floor (90% of contract demand) (in force). HT bills charge demand at the higher of the month's recorded peak or 90% of contract demand (₹375 per kVA a month for HT commercial in 2026-27, per the order). A battery saves demand charges only on peaks above that floor. Read more
Karnataka rooftop solar rules (DSPV Regulations 2026) (notified). Net metering for all consumers up to sanctioned load or 1,000 kW. Batteries are optional, with a review after two years or at 3 GW. For time-of-day users, surplus solar counts as an off-peak credit, so storing it for evening use is worth more. Read more
Karnataka open access rules 2025 (notified). Users of 100 kW or more can buy power from outside their DISCOM. Unused energy can be banked monthly, with a reported 8% banking charge. Read more
Telangana
Telangana HT time-of-day tariff (FY 2026-27) (in force). HT sites pay ₹1.50 a unit extra from 6 to 10 am and 6 to 10 pm, and ₹0.50 less from 10 am to 6 pm. No night rebate. HT commercial pays ₹8.80 a unit at 11 kV plus ₹500 per kVA a month. Read more
Telangana rooftop solar regulation, 2025 (notified). Commercial and industrial sites can put rooftop solar up to 80% of sanctioned load on net, gross or virtual net metering. Net and gross metered systems are exempt from banking, wheeling and cross-subsidy charges, as reported. Read more
Telangana green energy open access (in force). Sites with a load of 100 kW or more can buy green power through open access. Banking is capped at 30% of monthly use, lapses after the month and carries a charge of 8% of the energy banked, as reported. Read more
Telangana Clean and Green Energy Policy, 2025 (policy). Plans 3,388 MW of battery storage by FY 2029-30. Storage projects that sell power get stamp duty reimbursement on land and exemption from pollution board consent; battery factories get a 20% capital subsidy, capped at ₹30 crore. Read more
Andhra Pradesh
Andhra Pradesh time-of-day tariff (in force). HT factories pay more at 6-10 am and 6-10 pm and less at 10 am-3 pm and midnight-6 am (at 11 kV, ₹7.80 and ₹5.55 against ₹6.30 in high-demand months). HT commercial sites pay ₹1 extra from 6-10 pm, with no cheaper window, and are billed on at least 80% of contract demand. Read more
Andhra Pradesh battery storage regulations (notified). Any consumer can add a battery behind its meter, of any size, without DISCOM permission. It must tell the DISCOM before commissioning and meet CEA standards. Grid-connected projects must be at least 1 MW for two hours at 11 kV or above. Read more
Rooftop solar metering and battery export rate (in force). Net metering up to 500 kW, net billing up to 1,000 kW, gross metering up to 5,000 kW. On time-of-day tariffs, net-metered exports offset only off-peak use. HT gross-metered solar with a battery supplying at peak earns ₹4.17 a unit. Read more
Green open access banking limits (notified). Banked green power is settled monthly by time-of-day slot and capped at 30% of your monthly DISCOM purchase; the excess lapses. Power banked in off-peak hours can only be drawn in off-peak hours. Read more
Madhya Pradesh
Madhya Pradesh evening surcharge and solar-hour rebate (in force). HT users and LT business users above 10 kW pay 20% more for energy from 6 to 9 am and 5 to 10 pm, and 20% less from 9 am to 5 pm: a ₹3.26 a unit gap for an HT office on 11 kV. Read more
Madhya Pradesh 90% billing-demand floor (in force). HT fixed charges are billed on actual maximum kVA or 90% of contract demand, whichever is higher. A battery that trims the peak cuts fixed charges only down to that floor; below it, contract demand has to come down too. Read more
Madhya Pradesh 30% banking cap for green open access (in force). Green open access buyers can bank at most 30% of their monthly DISCOM consumption, and banking follows the tariff's peak and off-peak periods. Surplus above the cap is where a battery helps. Read more
Chhattisgarh
Chhattisgarh 5% storage proposal (draft). New distributed renewable projects above 5 MW commissioned from 1 April 2027 would need two-hour storage of 5% of capacity, plus 20% of any captive capacity above contract demand. Banking would carry time-of-day charges. Read more
West Bengal
West Bengal demand charge on recorded peak (in force). WBSEDCL high-voltage sites pay ₹384 per kVA a month on recorded demand. Each 100 kVA a battery cuts from the monthly peak saves about ₹38,400 a month, if it catches every peak. Read more
West Bengal time-of-day tariff option (in force). HV sites can choose time-of-day rates. An 11 kV commercial site pays ₹9.99 a unit from 5pm to 11pm and ₹3.82 from 11pm to 6am in summer, a ₹6.17 gap a battery can use. Read more
West Bengal rooftop solar rules 2025 (in force). Net metering from 1 kW to 500 kW, and net billing or gross metering up to contract demand. WBSEDCL pays ₹3.89 a unit for HV exports in 2025-26, so storing solar for own use is usually worth more. No battery requirement. Read more
West Bengal green tariff and green open access (in force). Sites can buy green power from WBSEDCL at 50 paise a unit over the normal tariff, for at least 25% of use for six months. Green open access is open to users of 100 kW or more. Read more
This is a guide, not legal advice. Status words follow the source: notified or in force means final; draft means proposed; policy means a government policy rather than a binding rule; benchmark means a standard written for another kind of project. Check the source in each issue before you act.
What changed, by date
31 Oct 2026: Dated market notes added on exchange prices, CERC storage rules, open access, tariff trends and fuel prices
21 Oct 2026: GRAP Stage I invoked across Delhi-NCR, bringing the diesel generator curbs into force for the winter
19 Oct 2026: Gujarat's final battery storage regulations reported, covering registration of grid-connected batteries
5 Oct 2026: CEA seeks comments on its draft list of battery safety standards; comments close 15 November 2026
29 Sep 2026: Revised GRAP schedule moves diesel generator curbs to Stage I
22 Sep 2026: Chhattisgarh draft would require storage with new distributed solar above 5 MW
21 Sep 2026: CERC draft grid code amendment on when a storage project counts as commissioned
3 Sep 2026: CEA draft would require storage at new ground-mounted solar and wind plants
31 Aug 2026: CERC deviation settlement amendment in force for new wind and solar
19 Aug 2026: Karnataka notifies rooftop solar regulations; batteries optional
2 Jul 2026: UPERC tariff order for 2026-27
1 Apr 2026: Telangana raises the HT peak charge to ₹1.50 a unit
26 Mar 2026: MPERC tariff order for 2026-27: 20% evening surcharge, 20% solar-hour rebate
25 Mar 2026: APERC keeps tariffs and time-of-day windows unchanged for 2026-27
18 Mar 2026: Maharashtra requires storage with new renewable projects above 100 kW
13 Mar 2026: Captive power rules amended: group companies count as one captive user
What we don't know yet
Whether any state commission will set its own date for the diesel generator switch.
Which drafts will be finalised as written, and when.
How strictly each rule will be checked at small sites.
Questions we get asked
Q: Which rules apply to a business battery in India from April 2027? A: Two CEA rules start on 1 April 2027: the battery safety chapter for systems connected above 650 volts, and CEA's technical standards for grid-scale batteries, which set 80% health at year 10, a useful benchmark for site warranties. Time-of-day tariffs for business users above 10 kW were due from April 2024 under the 2023 rules; a 2026 draft resets that deadline to 1 April 2027.
Q: Do I have to replace my diesel generator? A: Not by a fixed date yet. A 2022 rule asks sites to move to cleaner backup within five years or by their state's timeline. In Delhi and the NCR, older diesel sets face winter curbs by size, and sets that meet neither condition may run only for listed emergency services.
Q: Which states does the check cover? A: Delhi and the NCR, Haryana, Uttar Pradesh, Rajasthan, Maharashtra, Gujarat, Karnataka, Telangana, Andhra Pradesh, Madhya Pradesh, Chhattisgarh and West Bengal, plus the national rules that apply everywhere. Each state has a guide that explains its tariffs and storage rules with the primary sources.
Q: How often is this check updated? A: Every week, when a new issue of The Storage Brief adds or changes a rule.
Sources
Each rule above links to the issue that explains it, and each issue lists its primary sources: the notification, order or draft itself where we could open it.
Keep reading
Key dates: Battery rules calendar for Indian businesses: key dates to April 2027
The diesel rule: India's diesel generator rule: the five-year switch most sites missed
Where tariffs are heading: Business power tariffs in 2026-27: which way are they moving?
Vaultus puts business batteries on a monthly plan. The battery maker installs and maintains the system, the site pays monthly, and the contract sets how much backup it gets. Send a stalled quote, or your latest electricity bills and diesel records, to contact@vaultus.io, or run your own numbers with the site calculator.