Uttar Pradesh: battery, diesel and solar rules for business sites
Updated: 3 days ago
A business site in Uttar Pradesh faces four state-specific rules on power, diesel and solar. The biggest is UPERC's tariff order of 2 July 2026: urban factories pay 15% more in the evening peak and 15% less at night or early morning, but commercial sites on HV-1 have no time-of-day rate, so their battery case rests on fixed charges and diesel. Sites in UP's eight NCR districts also face GRAP's winter diesel curbs.
The Storage Brief, state guide, updated 31 October 2026
The rules at a glance
UPERC tariff order, FY 2026-27 (in force). The order sets rates for the five state DISCOMs (PVVNL, MVVNL, DVVNL, PuVVNL, KESCo). Parts of Greater Noida have a separate licensee with its own schedule.
GRAP in UP's NCR districts (in force). The winter air plan covers the eight UP districts in the NCR and curbs diesel generators from Stage I.
UP Solar Energy Policy 2022 (policy). The policy waives electricity duty on solar for ten years, captive included.
Rooftop net billing (policy). The 2022 policy says business users get net billing, with rooftops of up to 2 MW, under UPERC's 2019 rooftop regulations. We could not open those regulations, so check current terms with your DISCOM.
Your electricity bill
The FY 2026-27 rate schedule keeps last year's time-of-day bands for urban LMV-6 (small and medium industry) and HV-2 (large industry):
April to September: 15% off from 05:00 to 10:00, 15% extra from 19:00 to 03:00.
October to March: 15% extra from 17:00 to 23:00, 15% off from 23:00 to 05:00.
HV-2 at up to 11 kV pays ₹300 per kVA a month and ₹7.10 per kVAh.
HV-1 covers commercial users of 75 kW and above on 11 kV or higher. At 11 kV it charges ₹430 per kVA a month plus ₹8.32 per kVAh, the same at every hour. The 2023 national rule asked states to bring in time-of-day rates for business users above 10 kW; UP's schedule still has none for HV-1 or LMV-2.
Take an HV-1 office campus at 11 kV with 500 kVA billed demand and 1,00,000 kVAh a month (an example). The fixed part is ₹2,15,000 and the energy part ₹8,32,000 (our calculation: 500 × ₹430; 1,00,000 × ₹8.32), so fixed charges are about 21% of the base bill (our calculation: ₹2,15,000 ÷ ₹10,47,000). Shifting load saves nothing. If the fixed charge is billed on recorded demand, trimming 50 kVA off the peak saves ₹21,500 a month (our calculation: 50 × ₹430); if on contracted load, you would also need to cut the contract.
Diesel backup
We found no UPERC timeline under the national diesel backup rule, Rule 10(6).
GRAP applies in UP's NCR districts: Meerut, Ghaziabad, Gautam Buddh Nagar (Noida and Greater Noida), Bulandshahr, Baghpat, Hapur, Shamli and Muzaffarnagar. Stage I was invoked across the entire NCR on 21 October 2026 at a Delhi air quality index of 244, All India Radio reported. Size bands are in our GRAP guide. Lucknow, Kanpur and Varanasi are outside the NCR.
Grid power at the HV-1 rate, stored in a battery, costs about ₹9.24 a unit after losses (our calculation: ₹8.32 ÷ 0.9). Our diesel guide's example put generator power near ₹34 a unit.
Solar and storage
The 2022 policy's capital subsidy of ₹2.50 crore per MW goes to utility-scale solar with four-hour storage of 5 MW or more, and to standalone batteries charged only from solar, that sell to a DISCOM or UPPCL (clause 11.2). On our reading, a battery behind a site's meter does not qualify. The policy runs five years or until replaced. We found no UP rule tying storage to rooftop or captive solar.
The DISCOMs are buying storage at grid scale. UPERC approved UPPCL's 375 MW / 1,500 MWh procurement with viability gap support, Mercom reported; the auction closed in May 2026 at ₹6.45 to ₹6.46 per kWh, Power Line reported.
What it means for you
If you run a site: A factory can earn back a battery on the time-of-day swing. An office, hospital or mall on HV-1 earns it on fixed charges and avoided diesel.
If you make or install batteries: Ask for the tariff category first. An HV-1 quote promising time-of-day savings will fail the first bill check.
If you lend or lease: Underwrite UP commercial deals on diesel displaced and demand trimmed, and factory deals on the 15% swing, which any year's order can change.
The number to know
₹2.13 per kVAh: the peak to off-peak gap for an urban HV-2 factory at up to 11 kV; for HV-1 commercial sites it is zero. Our calculation: ₹7.10 × 1.15 = ₹8.165; ₹7.10 × 0.85 = ₹6.035; difference ₹2.13.
What to do now
Find your tariff category and supply voltage on your bill, and ask your DISCOM in writing how the fixed charge is billed.
In an NCR district, list every diesel set by size and fuel mode before the next GRAP stage.
If you plan solar, confirm the duty waiver and net billing terms for your connection.
What we don't know yet
Whether UPERC will add time-of-day rates for commercial users, as the 2023 national rule asked.
Whether UPERC will set a diesel backup timeline under Rule 10(6).
What replaces the 2022 solar policy, and whether site batteries get anything.
Questions people ask
Q: Do commercial buildings in UP pay time-of-day electricity rates? A: Not under the 2026-27 schedule. Only urban LMV-6 and HV-2 industrial users do.
Q: Does GRAP apply in Noida and Ghaziabad? A: Yes. GRAP covers the whole NCR, including eight UP districts such as Gautam Buddh Nagar and Ghaziabad.
Q: Can a business get UP's battery subsidy for its own site? A: Not on our reading. The subsidy goes to utility-scale solar with storage, and solar-charged standalone batteries, selling to a DISCOM or UPPCL.
Sources
ARR and tariff order for the UP state DISCOMs, FY 2026-27. Uttar Pradesh Electricity Regulatory Commission, 2 July 2026.
Rate schedule, FY 2026-27 (public notice). UP Power Corporation, July 2026.
Uttar Pradesh Solar Energy Policy 2022. Government of Uttar Pradesh, 2022.
Constituent areas of the NCR. National Capital Region Planning Board.
CAQM invokes Stage-I GRAP across NCR as Delhi AQI enters poor category. All India Radio, 21 October 2026.
UPERC approves procurement of 1,500 MWh battery storage. Mercom India, 10 September 2025.
UPPCL announces results for 375 MW/1,500 MWh BESS. Power Line, 4 May 2026.
Keep reading
Next state guide: West Bengal: battery, diesel and solar rules for business sites
Check your site: Which battery and diesel rules apply to my site? A quick check for India
Where tariffs are heading: Business power tariffs in 2026-27: which way are they moving?
Vaultus puts business batteries on a monthly plan. The battery maker installs and maintains the system, the site pays monthly, and the contract sets how much backup it gets. Send a stalled quote, or your latest electricity bills and diesel records, to contact@vaultus.io, or run your own numbers with the site calculator.