Battery safety, insurance and end of life: what to plan for

Updated: 24 hours ago
From our archive: we wrote this note after the week shown above, as part of our back catalogue. For anything newer, see the latest posts in this section.
Updated 17 November 2026: we checked CEA's notified safety text, which confirms the 650 V test, sets the fire audit deadline and drops the fixed spacing rule, and we added questions to put to your insurer and supplier.
Three things decide whether a business battery is safe to own: the fire rules it must meet, the insurance that pays if it burns, and who takes it back at the end. From 1 April 2027, batteries connected above 650 V must meet CEA's new fire chapter, including an independent fire audit within three months. Insurance follows your standard fire policy, so declare the battery before it arrives. At end of life, the brand that sold or imported the battery carries the recycling duty, not the site.
The Storage Brief, market note, updated 17 November 2026. Next update due in the first week of December 2026.
What changed, by date
15 Nov 2026 (closed): comments closed on CEA's draft list of standards under its safety rules. The draft names IEC 62619 for battery testing but not IS 16805, its identical Indian twin. CEA, our note
30 Mar 2026 (notified): CEA's safety amendment, dated 27 March and published in the Gazette on 30 March 2026, adds Chapter XA from 1 April 2027 for battery installations "connected at voltage level exceeding 650 V": fire detection, automatic suppression in every container, spacing by chemistry and an independent fire audit "within a period of three months from the date of commencement". CEA gazette copy, our explainer
12 Dec 2025 (draft): CEA's audit procedure proposes an audit before first energisation, then at least once every five years and after a fire or major repair, with fires reported within 48 hours. CEA
21 Oct 2025 (reported): The Ministry of New and Renewable Energy (MNRE) said the storage battery item in its solar order covers batteries for solar off-grid use, as scoped in IS 16270:2023. SolarQuarter
24 Feb 2025 (in force): Battery producers may show their EPR (extended producer responsibility) registration as a QR code or barcode. Gazette, S.O. 958(E)
Safety: what the notified rules settle
The gazette text answers two questions we left open in October.
Which systems are in. The main clauses apply to installations "connected at" above 650 V. The amendment defines a battery system as connected to the electricity system, and the inverter as the part that turns DC into AC for it. On our reading, the test is the AC connection voltage, not the DC voltage inside the racks. A battery on 11 kV is in. One connected at 415 V must meet the listed standards instead. A battery on the 415 V side of an HT site's own transformer is the grey case. Ask the Electrical Inspector in writing.
When the audit falls due. Within three months of 1 April 2027, so about 1 July 2027 for a system already running (our calculation). The report goes to the Electrical Inspector at inspection. CEA's audit procedure is still a draft, and the draft puts the first audit before switch-on, which is when a maker expects to be paid.
Spacing is now set by chemistry "as per relevant standard", not the 7.5 metres in the 2025 draft.
Building rules have not caught up. The National Building Code 2016 (Part 4) asks that batteries, wherever provided, be segregated by 120-minute fire-rated construction. In the part we read, we found no clause written for lithium-ion battery rooms. Ask your local fire authority whether a battery room changes your fire NOC (no objection certificate).
IS 16805:2018 is identical to IEC 62619:2017, the safety standard for industrial lithium batteries. The BIS record shows no licences under it, and we found no order making it compulsory.
Insurance: what to ask before the battery arrives
IRDAI's standard fire products, in force since April 2021, cover locations with value at risk up to ₹5 crore (Bharat Sookshma Udyam Suraksha) and ₹5 crore to ₹50 crore (Bharat Laghu Udyam Suraksha), with plant insured at reinstatement or replacement value. An example: a factory with ₹4.2 crore of insured property at one location adds a ₹1.5 crore battery. At renewal it moves to the larger product (our calculation: 4.2 + 1.5 = ₹5.7 crore, above the ₹5 crore line). We found no IRDAI rule written for batteries.
Ask your insurer in writing:
Is the battery covered under our fire policy from the day it arrives, and at what sum insured?
If a fire starts inside the battery itself, is it paid as fire, or treated as breakdown or another excluded cause?
Does a fire in the battery that damages the building or stock count as one claim?
Do you need the CEA fire audit report, or the IS 16805 or IEC 62619 test report, before you cover it?
Is breakdown of the inverter or battery management system covered, and under which policy?
Then ask the supplier the question sites always ask: who fixes the battery, and who pays if it stops working? Get the answer, the response time and the replacement terms in the contract, not the brochure.
End of life: who takes it back
The Battery Waste Management Rules, 2022 count energy storage batteries as industrial batteries. The producer (the brand that makes, sells or imports one) must collect and recycle: for 2026-27, 70% by weight of the industrial batteries it placed on the market in 2023-24, met by buying EPR certificates from registered recyclers and refurbishers. A 2024 amendment pegged certificate prices at 30% to 100% of the penalty for missing the target: ₹720 to ₹2,400 per kg of lithium, says the Centre for Science and Environment (CSE). The site need only hand the old battery to a collector, refurbisher or recycler.
Refurbishers must register with the state pollution control board, and anyone selling a refurbished battery under its own brand becomes a producer. CSE cites market figures of ₹32 to ₹50 per kg of recoverable value for LFP (lithium iron phosphate) cells, against ₹100 to ₹180 for NMC, and says refurbished packs often sell 30% below new. In our judgement, a lender should treat a stationary LFP battery's end-of-term value as close to nil and price the contract on the site's payments.
What it means for you
If you run a site: Get the connection voltage, the IS 16805 or IEC 62619 test report and who pays for the fire audit in writing. Send your insurer the five questions above before delivery.
If you make or install batteries: If you sell under your own brand or import, you're the producer: register with the Central Pollution Control Board and budget for EPR certificates. Price the fire audit into quotes above 650 V.
If you lend or lease: Tie the handover payment to the fire audit report above 650 V. Name the producer and the end-of-term route in the contract, and ask for the standard Agreed Bank Clause on the fire policy.
The number to know
35%: the minimum share of domestically recycled material, by dry weight, in new industrial batteries from 2027-28, rising to 40% from 2029-30. Source: Battery Waste Management (Second Amendment) Rules, 2024.
What to watch next
CEA's final list of standards, due within three months of 1 April 2027 under the new regulation 137, and whether it adds IS 16805.
CEA's final fire audit procedure.
1 April 2027: Chapter XA takes effect; the 35% recycled-content rule applies from 2027-28.
What we don't know yet
Whether inspectors will treat a battery on the 415 V side of an HT site as "connected at" 415 V.
How the Central Pollution Control Board will apply the 35% rule to lithium-ion industrial batteries. The table sets one figure for all chemistries.
What Indian insurers charge for, or exclude from, business battery cover.
Questions people ask
Q: Does a business battery need a BIS mark in India? A: Only some do. MNRE's 2025 order covers batteries in solar off-grid systems, as reported. We found no order making IS 16805 compulsory.
Q: Who has to recycle a business battery in India? A: The producer: the brand that made, sold or imported it. The site must hand the old battery to a collector, refurbisher or recycler.
Q: Will my fire insurance cover a battery? A: It adds to your value at risk, and plant is insured at reinstatement or replacement value. Declare it before installation and ask your insurer in writing how a fire that starts inside the battery is treated.
Q: When does a business battery need a CEA fire audit? A: If it is connected above 650 V, within three months of the rules starting on 1 April 2027, with the report given to the Electrical Inspector.
Sources
Central Electricity Authority (Measures relating to Safety and Electric Supply) Amendment Regulations, 2026. Gazette of India, Extraordinary, No. 231, 30 March 2026.
Seeking public comments on draft List of Relevant Standards. Central Electricity Authority, 5 October 2026.
Draft SoP for Independent Third Party Fire Safety Audit of BESS. Central Electricity Authority, signed 12 December 2025.
Battery Waste Management Rules, 2022, S.O. 3984(E). Ministry of Environment, Forest and Climate Change, August 2022.
Battery Waste Management (Second Amendment) Rules, 2024, S.O. 2374(E). Ministry of Environment, Forest and Climate Change, 20 June 2024 (gazette copy).
Battery Waste Management Amendment Rules, 2025, S.O. 958(E). Ministry of Environment, Forest and Climate Change, 24 February 2025.
Guidelines for Standard Products for Fire and Allied Perils. IRDAI, 4 January 2021.
IS 16805:2018 / IEC 62619:2017. Bureau of Indian Standards.
Electric vehicle battery recycling and EPR: reform the terms of action. Centre for Science and Environment, 2026.
Keep reading
**The safety chapter: **CEA battery safety rules: what changes for storage from April 2027
**Contract terms: **Five clauses a CFO should check in a battery contract
**Check your site: **Which battery and diesel rules apply to my site? A quick check for India
Vaultus puts business batteries on a monthly plan. The battery maker installs and maintains the system, the site pays monthly, and the contract sets how much backup it gets. Send your last 12 months of electricity bills and diesel records to contact@vaultus.io, or run your own numbers with the site calculator.