Karnataka: battery, diesel and solar rules for business sites

Updated: 3 days ago
From our archive: we wrote this note after the week shown above, as part of our back catalogue. For anything newer, see the latest posts in this section.
A business site in Karnataka faces four state rules beyond the national ones: a time-of-day tariff, a floor on billed demand, new rooftop solar rules and open access rules for bought-in green power. The biggest is the time-of-day tariff. From December to June, high-tension (HT) sites with a contract demand of 500 kVA or more pay ₹1 a unit extra at the morning and evening peaks and get ₹1 off at night: a ₹2 gap a battery can earn from.
The Storage Brief, state guide, updated 31 October 2026
The rules at a glance
Time-of-day tariff (in force). Compulsory for HT business, hospital and education users of 500 kVA and above; optional below. Set in the KERC Tariff Order 2025.
Billed demand floor (in force). HT bills charge for the higher of recorded maximum demand or 90% of contract demand. Same schedule.
Rooftop solar rules, DSPV Regulations 2026 (notified). Net metering for all consumers up to sanctioned load or 1,000 kW, with batteries optional (notified text).
Open access rules 2025 (notified). Users of 100 kW or more can buy power from outside the DISCOM, with monthly banking, Renewable Watch reported.
Your electricity bill
The Karnataka Electricity Regulatory Commission (KERC) set tariffs for April 2025 to March 2028 in one order of 27 March 2025, for BESCOM, MESCOM, HESCOM, GESCOM and CESC Mysore. For 2026-27 it lists HT commercial (HT-2b) at ₹375 per kVA a month plus 570 paise a unit, and HT industrial (HT-2a) at ₹350 per kVA plus 660 paise.
A review order of 3 March 2026 raised some business rates by 10 to 95 paise a unit, putting HT commercial at ₹390 per kVA and ₹6.90 a unit, ThePrint reported. Check your own bill.
From December to June, 6am to 9am and 6pm to 10pm cost 100 paise a unit more, and 10pm to 6am costs 100 paise less. From July to November there is no surcharge or rebate.
Take an HT commercial site in Bengaluru with a 1,000 kVA contract demand and a 1,000 kVA evening peak (an example, at the order's 2026-27 rates). Its battery delivers 500 kWh from 6pm to 10pm, about 125 kW.
Energy: it buys about 556 kWh at night to deliver 500 kWh, after 10% losses. Our calculation: night cost 556 × ₹4.70 = ₹2,613; peak cost avoided 500 × ₹6.70 = ₹3,350; saving ₹737 a day, or about ₹1.56 lakh over the 212 days from December to June.
Demand: the battery could cut the peak by about 125 kVA, but the bill can't fall below 900 kVA. Our calculation: 100 kVA × ₹375 = ₹37,500 a month. The last 25 kVA earns nothing unless contract demand is lowered.
Diesel backup
We found no KERC timeline under Rule 10(6) of the consumer rules, so the national five-year push applies. Bengaluru Urban is one of five districts in India with the highest PM2.5 emissions from diesel sets, a CSTEP study found in August 2025. The 2026 solar rules let a hybrid inverter run off a diesel set's voltage during a cut, if the set is at least 30% loaded and a zero-export device stops back-feeding.
Since 1 April 2026, eligible HT industrial users hit by frequent and prolonged outages are due lower demand charges, SolarQuarter reported.
Solar and storage
The June draft of the DSPV Regulations would have required storage equal to 20% of generation above 10 kW, Energetica India reported. The text notified on 19 August 2026 made batteries "at their option". KERC will review prosumer storage after two years or at 3 GW of rooftop capacity, whichever comes first.
For a time-of-day user, surplus solar is set against use in the same window first, and the rest counts as an off-peak credit. So midday solar sent to the grid offsets your cheapest units. Stored and used after 6pm, it replaces your dearest.
On the grid, KPTCL awarded 350 MW/700 MWh of a 500 MW/1 GWh battery tender in April 2025 at ₹2.49 to ₹2.54 lakh per MW a month, Renewable Watch reported. We found no state subsidy for site batteries.
What it means for you
If you run a site: Your time-of-day status and your demand against the 90% floor decide what a battery can save.
If you make or install batteries: Size Karnataka offers around the December to June evening peak and the demand floor, not a year-round spread.
If you lend or lease: The ₹2 gap runs seven months, not twelve. Model cash flows by season.
The number to know
₹2 a unit: the gap between Karnataka's evening peak and night rate for HT business users, December to June only. Our calculation: +100 paise peak minus −100 paise night, from the KERC Tariff Order 2025.
What to do now
Pull 12 months of HT bills and compare recorded maximum demand with 90% of contract demand.
Ask your DISCOM in writing whether your time-of-day billing is compulsory or optional.
Get rooftop solar quotes with and without a battery under the 2026 rules.
What we don't know yet
Whether the 3 March 2026 review rates carry into 2026-27 bills for every category, or only 2025-26.
What KERC will decide when it reviews prosumer storage, due by August 2028 at the latest.
Whether KERC will set a diesel timeline or extend time-of-day billing below 500 kVA.
Questions people ask
Q: Does Karnataka give a discount for using power in solar hours? A: No. The only rebate is 100 paise a unit at night, December to June.
Q: Do I need a battery with rooftop solar in Karnataka? A: No. The draft proposed one above 10 kW, but the notified 2026 rules made batteries optional.
Q: Can a battery cut my demand charges to zero? A: No. Bills charge for at least 90% of contract demand, so a battery saves only on peaks above that line.
Sources
KERC (Grid Interactive Distributed Solar Photovoltaic (DSPV) Plants) Regulations, 2026. KERC, published on BESCOM's rooftop portal, 19 August 2026.
Electricity Tariff 2026, Annexure-2 to KERC Tariff Order 2025 (FY2025-26 to FY2027-28). KERC, 27 March 2025, as published by a state licensee.
Switch on, smoke off: Reducing emissions from diesel generator sets. CSTEP, 20 August 2025.
KERC increases electricity tariffs for commercial, industrial consumers. ThePrint (PTI), 4 March 2026.
Karnataka announces open access regulations 2025. Renewable Watch, 25 April 2025.
KERC proposes new solar rules, mandates storage for DSPV systems above 10 kW. Energetica India, 11 June 2026.
Keep reading
Next state guide: Madhya Pradesh: battery, diesel and solar rules for business sites
Check your site: Which battery and diesel rules apply to my site? A quick check for India
Where tariffs are heading: Business power tariffs in 2026-27: which way are they moving?
Vaultus puts business batteries on a monthly plan. The battery maker installs and maintains the system, the site pays monthly, and the contract sets how much backup it gets. Send your last 12 months of electricity bills and diesel records to contact@vaultus.io, or run your own numbers with the site calculator.