A business site in Andhra Pradesh faces five state rules on batteries, solar and power prices, on top of the national ones. The one every site feels is the time-of-day tariff, which the Andhra Pradesh Electricity Regulatory Commission (APERC) kept unchanged for 2026-27. The most useful for battery buyers is APERC's 2025 storage regulation, which lets any consumer add a battery behind the meter without DISCOM permission.
The Storage Brief, state guide, updated 31 October 2026
The rules at a glance
Time-of-day tariff (in force). Peak-hour surcharges for HT factories and offices, with a cheaper window for factories only. APERC's press note on the FY 2026-27 tariff order says there is "no tariff increase for any consumer category".
Battery storage regulations, 2025 (notified). Regulation No. 5 of 2025 lets all consumers install behind-the-meter batteries of any size, if they tell the DISCOM before commissioning (APERC statement of reasons, 10 September 2025).
Rooftop solar metering (in force). Net metering up to 500 kW, gross metering up to 5,000 kW, and a higher export rate for HT solar with a battery (Regulation No. 4 of 2023, as amended).
Green open access and banking (notified). Monthly banking by time slot, capped at 30% of a consumer's monthly DISCOM purchase (Regulation No. 11 of 2025, order of 4 December 2025).
Integrated Clean Energy Policy, 2024 (policy). A 25 GWh battery storage target, 3.6 GWh of it for open access buyers (policy text).
Your electricity bill
HT industry pays a peak rate from 6 to 10 am and 6 to 10 pm, and a cheaper rate from 10 am to 3 pm and midnight to 6 am. HT commercial pays ₹1 a unit extra from 6 to 10 pm, with no cheaper window (APERC retail supply tariff order FY 2026-27). APERC rejected the DISCOMs' request to move the windows to a 9 am to 5 pm cheap slot and decided "to continue the existing ToD timings".
At 11 kV, the FY 2026-27 tariff schedule sets a demand charge of ₹475 per kVA a month for both groups. HT commercial pays ₹7.65 per kVAh, plus ₹1 from 6 to 10 pm (₹8.65). HT industry pays ₹6.30 normally, ₹5.55 off-peak, and ₹7.80 at peak in high-demand months (February to May, September and October) or ₹7.30 in other months. For HT commercial sites, billed demand is the month's recorded maximum or 80% of contract demand, whichever is higher.
Take an 11 kV office campus running 300 kVA through the four evening peak hours (an example, at the approved rates). A battery carrying 1,200 kVAh each evening avoids ₹10,380 of peak power; charging it at the normal rate, with 10% losses, costs ₹10,200. The saving is ₹180 a day, about ₹5,400 a month (our calculation: 1,200 × ₹8.65 = ₹10,380; 1,200 ÷ 0.9 × ₹7.65 = ₹10,200; ₹180 × 30). A factory doing the same in high-demand months saves ₹1,960 a day (our calculation: 1,200 × ₹7.80 − 1,200 ÷ 0.9 × ₹5.55). Cutting billed demand by 100 kVA is worth ₹47,500 a month (our calculation: 100 × ₹475), as long as the new peak stays above 80% of contract demand.
Diesel backup
We found no APERC timeline under Rule 10(6) of the national consumer rules, so the national five-year push applies, and Delhi-NCR's winter curbs don't reach the state. The case rests on running cost. A diesel unit costs about ₹34 at ₹95 a litre and 2.8 units a litre; a battery charged at ₹7.65 delivers a unit for about ₹8.50 (our calculation: ₹95 ÷ 2.8; ₹7.65 ÷ 0.9).
Solar and storage
The 2025 storage regulation allows "All Consumers, including those covered under net-metering/billing" to add a battery with or without solar. No permission is needed, but the DISCOM must be told before commissioning and CEA standards apply. Grid-connected projects must be at least 1 MW with two hours of storage at 11 kV or above. Behind-the-meter sizes "may be as per their choice".
The rooftop regulation pays ₹4.17 a unit for HT gross-metered solar with a battery supplying at peak, against ₹2.71 to ₹3.13 without one. For ToD consumers on individual net metering, exports offset only off-peak use.
For DISCOM purchases, APERC approved 1,000 MW / 2,000 MWh at seven substations on 30 June 2026, at ₹1.48 lakh to ₹1.65 lakh per MW a month for 12 years, with "2 full charge-discharge cycles per day". A further 1,250 MW / 5,000 MWh tender closes on 23 November 2026, Energetica India reported.
What it means for you
If you run a site: A battery won't pay for itself on the commercial peak gap alone. Size it for diesel hours and demand charges first.
If you make or install batteries: With no permission step, the sale is shorter. Keep the DISCOM notice and CEA papers in every handover pack.
If you lend or lease: The regulation lets a consumer own or lease a battery. Underwrite on diesel savings, not the ToD spread.
The number to know
₹2.25 a unit: the gap between peak and off-peak power for an 11 kV HT factory in high-demand months. HT commercial gets only a ₹1 peak surcharge. Our calculation: ₹7.80 − ₹5.55, from APERC's FY 2026-27 tariff schedule.
What to do now
Pull 12 months of HT bills and check which ToD slots your load falls in.
List generator hours and litres bought; that is the cost a battery replaces.
If you install a battery, send the DISCOM written notice before commissioning, as the 2025 regulation requires.
What we don't know yet
Whether the DISCOMs will propose the 9 am to 5 pm cheap window again for 2027-28.
Questions people ask
Q: Do I need DISCOM approval to install a battery in Andhra Pradesh? A: Not for a behind-the-meter system, but you must inform the DISCOM before commissioning and meet CEA standards.
Q: Does Andhra Pradesh have a cheaper daytime tariff for offices? A: No. HT commercial sites pay ₹1 extra from 6 to 10 pm; only HT industry has an off-peak rate.
Sources
Retail supply tariff order FY 2026-27. APERC, 2026.
Press note, Retail Supply Tariff Order FY 2026-27. APERC, 25 March 2026.
Statement of reasons and BESS Regulations 2025. APERC, 10 September 2025.
Order on Regulation No. 11 of 2025, green open access and banking. APERC, 4 December 2025.
Order in O.P. No. 18 of 2026 on BESS. APERC, 30 June 2026.
ARR and tariff proposal FY 2026-27, public notice. APEPDCL, 30 November 2025.
Andhra Pradesh Integrated Clean Energy Policy, 2024. Government of Andhra Pradesh, G.O.Ms. No. 37, 30 October 2024.
Keep reading
Next state guide: Karnataka: battery, diesel and solar rules for business sites
Check your site: Which battery and diesel rules apply to my site? A quick check for India
Where tariffs are heading: Business power tariffs in 2026-27: which way are they moving?
Vaultus puts business batteries on a monthly plan. The battery maker installs and maintains the system, the site pays monthly, and the contract sets how much backup it gets. Send your last 12 months of electricity bills and diesel records to contact@vaultus.io, or run your own numbers with the site calculator.