West Bengal: battery, diesel and solar rules for business sites

Writer: Vaultus
Vaultus
Sep 17
6 min read

Updated: 3 days ago

From our archive: we wrote this note after the week shown above, as part of our back catalogue. For anything newer, see the latest posts in this section.


A business site in West Bengal faces four state rules beyond the national ones: a demand charge on recorded peak, an optional time-of-day tariff, the 2025 rooftop solar rules and a green power option. The biggest are the demand charge and the time-of-day option. High-voltage (HV) sites supplied by WBSEDCL pay ₹384 per kVA a month on their recorded peak, and an 11 kV commercial site on the time-of-day scheme pays ₹9.99 a unit from 5pm to 11pm against ₹3.82 overnight.


The Storage Brief, state guide, updated 1 November 2026


What changed, by date

  • 17 Sep 2026 (reported): the state commission cleared ₹20.14 billion for West Bengal Power Development Corporation's 200 MW floating solar plant with an 80 MW/320 MWh battery at Bakreswar, Mercom reported. Source

  • 1 Sep 2026 (in force): new WBSEDCL industrial rates in the Damodar Valley Corporation (DVC) area took effect under an 11 August notice; PTI reported rises of ₹1.50 a unit at 11 kV and ₹1 at 33 kV. Source

  • 6 Apr 2026 (reported): the state invited bids, for WBSEDCL, for 500 MW/2,000 MWh of batteries at four substations on 15-year contracts, Renewable Watch reported. Source

  • 28 Aug 2025 (reported): the commission set feed-in tariffs for rooftop solar under net billing and gross metering, Mercom reported. Source

  • 31 Jul 2025 (in force): the 2025 rooftop solar regulations were published, replacing the 2020 rules. Source

  • 1 Apr 2025 (in force): WBSEDCL's 2025-26 tariff took effect under the order of 20 March 2025, to "continue till further order". Source


The rules at a glance

  • Demand charge on recorded peak (in force). HV sites pay ₹384 per kVA a month, billed on recorded demand. Set in the WBSEDCL 2025-26 tariff.

  • Time-of-day option (in force). HV sites can choose a time-of-day scheme with rates for 6am to 5pm, 5pm to 11pm (peak) and 11pm to 6am. For 11 kV commercial sites in summer: ₹6.60, ₹9.99 and ₹3.82 a unit. Same schedule.

  • Rooftop solar rules 2025 (in force). Net metering from 1 kW to 500 kW, and net billing or gross metering up to contract demand (WBSEDCL procedure).

  • Green tariff (in force). Sites can buy green power from WBSEDCL at 50 paise a unit over the normal tariff, for at least 25% of use for six months. Same schedule.


Your electricity bill

Most of the state buys from WBSEDCL. The former Durgapur Projects (DPL) area has its own, lower WBSEDCL schedule. About 567 sq km of Kolkata and nearby areas are supplied by CESC under its own tariff, Business Today reported. We could not open CESC's 2025-26 schedule, so the figures below are WBSEDCL's main schedule (outside the former DPL area).


We found no 2026-27 order. The 2025-26 tariff runs "till further order". All HV categories pay ₹384 per kVA a month "on the basis of recorded demand", with no floor named in the schedule. Summer energy rates at 11 kV:


  • Commercial, flat scheme: ₹6.77 a unit.

  • Commercial, time-of-day: ₹6.60 (6am to 5pm), ₹9.99 (5pm to 11pm), ₹3.82 (11pm to 6am).

  • Industry, flat scheme: ₹7.07 a unit.

  • Industry, time-of-day: ₹6.95, ₹8.37 and ₹5.18 in the same windows.


Monsoon and winter rates are a few paise lower. On the time-of-day scheme, a commercial site pays 48% more than the flat rate in the evening and 44% less at night (our calculation: 9.99 ÷ 6.77 = 1.48; 3.82 ÷ 6.77 = 0.56).


Take an 11 kV commercial site on the time-of-day scheme with a 1,000 kVA recorded peak (an example). A battery charges overnight, delivers 300 kWh each evening, and cuts the peak by about 150 kVA.


  • Demand: our calculation: 150 kVA × ₹384 = ₹57,600 a month, or about ₹6.9 lakh a year (₹57,600 × 12 = ₹6,91,200). One missed peak sets the bill.

  • Energy: our calculation: 300 kWh × ₹9.99 = ₹2,997 saved each evening; recharging needs about 333.3 kWh after 10% losses (300 ÷ 0.9), costing 333.3 × ₹3.82 = ₹1,273; net about ₹1,724 a day, or about ₹51,700 a month (× 30).

  • For an 11 kV factory the same shift is worth less: our calculation: 300 × ₹8.37 − 333.3 × ₹5.18 = about ₹784 a day.


On the flat scheme, shifting units saves nothing, so a site adding a battery should compare the two schemes on its own load first.


Diesel backup

We found no commission timeline under Rule 10(6) of the consumer rules, so the national five-year push applies. The state's 2022 air action plan for Kolkata, Howrah, Barrackpore, Durgapur, Haldia and Asansol proposed strict action against non-compliant diesel sets, Down To Earth reported. We found no 2025-26 state board order on diesel sets.


WBSEDCL charges ₹20 per kVA a month, on full capacity, for an in-situ captive plant synchronised with its system. The text does not name diesel sets; check if yours runs in parallel.


Solar and storage

The 2025 rooftop rules cover all consumers with at least 1 kW of load, capped at contract demand. Neither the reports nor WBSEDCL's procedure mention batteries.


For 2025-26 WBSEDCL lists a feed-in tariff of ₹3.89 a unit for HV systems under net billing. For an 11 kV factory on the flat scheme, our calculation: ₹7.07 bought minus ₹3.89 earned = ₹3.18 a unit, the gain from storing midday solar for evening use instead of exporting it.


Green open access is open to users of 100 kW or more under the 2022 rules, Mercom reported. On the grid, WBSEDCL has tendered 750 MW/3,000 MWh of batteries since October 2025 (our calculation: 250 + 500 MW; 1,000 + 2,000 MWh). We found no state subsidy for site batteries.


What it means for you

  • If you run a site: Your recorded monthly peak is your biggest lever.

  • If you make or install batteries: Size offers around peak shaving and the 5pm to 11pm window, and show the customer its bill on both schemes.

  • If you lend or lease: Savings depend on catching every monthly peak. Ask for 12 months of demand readings.


The number to know

₹6.17 a unit: the summer gap between the evening peak (₹9.99) and overnight (₹3.82) rates for an 11 kV commercial site on WBSEDCL's time-of-day scheme. Our calculation: 9.99 − 3.82 = 6.17. Add ₹384 per kVA a month for every kVA cut from the recorded peak.


What to do now

  1. Pull 12 months of HV bills and list the recorded maximum demand for each month.

  2. Price your last 12 months on both the flat and time-of-day schemes (CESC customers in Kolkata: ask CESC for its rates).

  3. Get rooftop solar quotes under net metering and net billing, with and without a battery.


What we don't know yet

  • When the commission will issue a 2026-27 order, and whether the new state government will change business rates.

  • Whether the tariff regulations set a minimum billed demand.

  • Whether the commission will set a diesel timeline under Rule 10(6).


Questions people ask

Q: Is there a time-of-day tariff for businesses in West Bengal? A: Yes, as an option for WBSEDCL's HV sites. The peak runs 5pm to 11pm; for 11 kV commercial sites it costs ₹9.99 a unit in summer against ₹3.82 from 11pm to 6am.


Q: Do I need a battery with rooftop solar in West Bengal? A: No. The 2025 rules, as reported, do not require one.


Sources


Keep reading





Vaultus puts business batteries on a monthly plan. The battery maker installs and maintains the system, the site pays monthly, and the contract sets how much backup it gets. Send your last 12 months of electricity bills and diesel records to contact@vaultus.io, or run your own numbers with the site calculator.