top of page

Delhi-NCR's revised GRAP curbs diesel generators from Stage I

Writer: Vaultus
Vaultus
Sep 28
6 min read

Updated: 23 hours ago

Update, 15 November 2026: Stage III has been in force across NCR since 6 November. Read our newer brief: GRAP Stage III is in force in NCR. Can your generator still run?.


From our archive: we wrote this note after the week shown above, as part of our back catalogue. For anything newer, see the latest posts in this section.


Updated 17 November 2026: added what Stages II and III changed for generators (nothing), the gas-supply note for small sets, and a worked example to rerun the cost with your own generator hours.


Across Delhi-NCR, the generator rules apply from GRAP Stage I, which has been in force since 21 October 2026. A diesel generator can't be a regular source of power, and older sets need dual fuel or a certified retrofit, by size. Stages II and III, now also in force, add no generator rule of their own, so Stage I's two actions decide whether your set can run all winter.


The Storage Brief, week of 28 September 2026


What changed

On 28 September 2026, the Commission for Air Quality Management (CAQM) approved a revised Graded Response Action Plan (GRAP). The revised schedule, dated 29 September 2026, moved the generator measures from Stage II to Stage I. Stage I is invoked when Delhi's air quality is forecast to turn "Poor" (AQI 201 to 300), so the curbs start earlier and last longer.


Two Stage I actions apply. Action 17: "Ensure that diesel generator sets are not used as regular source of power supply." Action 18: enforce regulated use of DG sets across industrial, commercial and residential sites under CAQM's Direction No. 76 of 29 September 2023.


Since then:


  • 21 October 2026: Stage I invoked across NCR.

  • 2 November 2026: Stage II invoked.

  • 6 November 2026: Stage III invoked across NCR, All India Radio reported, on top of Stages I and II. Neither Stage II nor Stage III adds a generator action. The Stage I rules carry on.


Can my set run? The size bands

From the schedule, by size of set:


  • Sets on gas (LPG, natural gas, biogas, propane or butane), any size: no restrictions.

  • Sets up to 800 kW (1,000 kVA) built to the 2022 standards (MoEFCC notification GSR 804(E)): no restrictions.

  • Older sets of 800 kW and above: allowed with an emission control system that meets the prescribed standards.

  • Older diesel sets of 41 kW to under 800 kW: allowed in dual-fuel mode or with a certified emission control retrofit.

  • Older diesel sets of 19 kW to under 41 kW: allowed in dual-fuel mode only. The schedule's note: a set in this band that is not on dual fuel only because gas infrastructure and supply are not available "shall be permitted only for prescribed emergency services".

  • Portable sets below 19 kW: "not to be generally permitted"; permitted only for the prescribed emergency services.


The schedule gives an emergency-services exception in two places only: to 19 kW to under 41 kW sets kept off dual fuel because gas is unavailable, and to portable sets below 19 kW. It gives no such exception to an older set of 41 kW or more without dual fuel or a retrofit; that set does not meet its condition. The prescribed emergency services are: lifts and escalators, hospitals and health care, railways, metro, airports and inter-state bus terminals, sewage treatment, water pumping, national security projects, and telecom and IT services.


Even a compliant set is limited by Action 17. It can back up the grid. It can't be your regular supply.


Rerun the cost with your own generator hours

A battery pays at sites that run their generator a lot. Sites that rarely do should keep the generator. The test is your own log, not a brochure.


  1. Find your units per litre. Divide the units your generator produced by the litres it burned, from the DG log or meter. Below we use 3.5 units a litre (an example); your figure may be lower on a lightly loaded set.

  2. Work out diesel cost per unit. Divide the diesel price by your units per litre. At ₹95.20 a litre and 3.5 units a litre, that is ₹27.20 a unit (our calculation: 95.20 ÷ 3.5).

  3. Multiply by your hours and load. An example: a factory that carries 250 kW through cuts burns about 71 litres an hour (our calculation: 250 ÷ 3.5 = 71.4), or ₹6,800 an hour at ₹95.20. At 300 generator hours a winter, that is ₹20.4 lakh (our calculation: 71.4 × 95.20 × 300). At 100 hours it is ₹6.8 lakh.

  4. Compare with a battery. A battery charged from the grid at, say, ₹8 a unit, with 85% round trip, delivers the same 250 kW for about ₹2,350 an hour (our calculation: 250 ÷ 0.85 × 8 = ₹2,353), an example only. The gap per hour is what pays for the battery. The fewer hours you run, the smaller the gap.


This leaves out generator maintenance, any dual-fuel kit or retrofit you would otherwise buy, and the cost of a stop if the set isn't allowed to run. Add yours.


What it means for you

  • Sites: Treat the generator as an emergency asset in winter. List which loads must ride through a cut, and for how long.

  • Battery makers: NCR quotes should show which loads the battery carries, for how long, and the diesel hours it replaces.

  • Lenders: GRAP returns every winter. Last season's Stage I was revoked only on 16 March 2026. That is a recurring, rule-driven reason to cut generator hours.


What to do now

  1. List every DG set on site with its kW rating, fuel, year, emission standard and any dual-fuel kit or retrofit certificate. Match each to the bands above.

  2. Pull last winter's diesel bills and outage hours. Separate short cuts from long ones.

  3. This week, run the four steps above with your own numbers before you take any quote.


What we don't know yet

  • How district officials will check fuel mode and retrofit certificates on site.

  • How strictly "regular source of power supply" will be read for sites on feeders with daily cuts.

  • When this season's Stage I will be lifted. Last season it ran to mid-March.


Questions people ask

Q: Can I run my DG set during a power cut under GRAP Stage I? A: As backup, yes, if it meets its size band: gas, built to the 2022 standards, dual fuel or certified retrofit, depending on size. The schedule's emergency-services exception covers only 19 kW to under 41 kW sets with no gas supply, and portable sets below 19 kW. No set may be your regular supply.


Q: Does GRAP Stage III ban diesel generators in Delhi-NCR? A: Stage III adds no generator rule of its own. The Stage I generator actions continue while Stage III is in force.


Q: Do GRAP diesel generator rules apply outside Delhi? A: Yes. GRAP applies across NCR, including Gurugram, Faridabad, Sonipat, Ghaziabad and Gautam Buddh Nagar.


Key facts


Sources


Keep reading


Vaultus puts business batteries on a monthly plan. The battery maker installs and maintains the system, the site pays monthly, and the contract sets how much backup it gets. Send your last 12 months of electricity bills and diesel records to contact@vaultus.io, or run your own numbers with the site calculator.

bottom of page