If your recorded peak runs above your contract demand month after month, raising the contract demand is often the cheapest fix on the bill. You stop paying a penalty rate on the excess, and the regulator will reset the figure for you anyway after three breaches in a year. Sites still hold back for five reasons: unpaid dues, works at the meter, voltage ceilings, room on the DISCOM's network, and habit. Most can be cleared. Here is what the rules say, with the arithmetic.


The Storage Brief, guide, updated 5 November 2026


The rules in four lines


  • The DISCOM must revise contract demand when you apply. If the change needs works, you pay for them at the approved schedule of charges, and a dispute over the works goes to the grievance forum. Regulation 7.6, MERC Supply Code 2021. Source

  • Three breaches in a financial year and the figure is reset for you. The DISCOM asks you to regularise; if you don't, it raises contract demand to the year's highest recorded peak from the next bill. Regulation 7.6. Source

  • Clear pending dues before you apply, unless a forum or court has stayed them. Regulation 5.4. Source

  • The security deposit is twice your average monthly bill, recalculated once a year on what you were actually billed, not on contract demand. Regulations 13.2 and 13.4. Source


Does raising it pay? A worked example


Take a site with a contract demand of 1,000 kVA whose peak reaches 1,350 kVA most months, on a demand charge of ₹600 per kVA a month. The tariff bills the full recorded peak and adds 150% of the demand charge on the excess, and the billing floor is 75% of contract demand (the structure printed on MSEDCL HT bills).


  • Today: 1,350 × ₹600 = ₹8,10,000, plus 1.5 × 350 × ₹600 = ₹3,15,000 penalty. About ₹11.25 lakh a month.

  • At a contract demand of 1,400 kVA: the floor is 1,050 kVA, below the 1,350 kVA peak, so the demand charge stays ₹8,10,000 and the penalty goes. About ₹3.15 lakh a month saved.

  • If the peak later falls to 1,000 kVA: 1,400 kVA bills a floor of 1,050 kVA, ₹6,30,000, against ₹6,00,000 at 1,000 kVA. That is ₹30,000 a month more.


So raise it when the peak is regular, then step it down once a battery or load control holds the peak below a target. Cutting first is the mistake we cover in the demand trap.


Five reasons sites don't, and what clears each


  1. Unpaid dues. An application with arrears on the account is not processed. Clear or settle them first, or get a stay if the amount is disputed.

  2. Works at the meter. A bigger contract demand can need new metering transformers (CTs and PTs). MERC's 2021 practice direction let a revision take effect within three days only where the existing CTs and PTs could carry it. Ask for the works estimate before you apply. Source

  3. Voltage ceilings. Each supply voltage has a cap: 11 kV up to 3,000 kVA, 22 kV up to 7,500 kVA, 33 kV up to 10,000 kVA, with higher caps (5,000, 10,000 and 20,000 kVA) in a metropolitan area or on an express feeder. Crossing one means moving to a higher voltage, which is a project, not a form. Regulation 3.2. Source

  4. Room on the network. Contract demand is capacity the DISCOM keeps free for you on its feeder and transformer. Where there is no headroom, it can say "not yet": the code allows three months where the mains need augmenting and a year where a new substation is needed. Regulation 5.8. Source

  5. Habit. Energy audits usually advise cutting contract demand to save fixed charges, and the penalty line sits among many others on the bill. Nobody owns the number. Seven lines on your bill shows where to look.


Why the DISCOM may say "not yet"


Usually for a network reason, not a commercial one. A higher contract demand commits feeder, transformer and metering capacity to your site. If that capacity isn't there, approval waits for works. Paperwork can also travel: in a 2018 case at 132 kV, MSEDCL told the grievance forum that the change needed head-office sanction and a transmission no-objection, and it took about four months through four offices. That was a reduction, not an increase, but the route is the same. Source


Ask early, in writing, for a feasibility answer and a works estimate. Choosing your own number before the third breach is better than having the year's worst peak chosen for you.


How often can you change it?


Regulation 7.6 sets no number. MERC has said it presumed one change per billing cycle, and its 2021 practice direction allowed HT consumers two per cycle until 31 March 2022, cutting the load-factor incentive cap after a second change. Check the current practice with your DISCOM before you plan a staged change. Source


What to do this week


  1. From your last 12 bills, list contract demand, recorded peak, billing demand and any excess-demand charge.

  2. Count the months above contract demand. Three in a financial year triggers the reset rule.

  3. Check how far your contract demand sits from your supply voltage's cap.

  4. Clear or settle any dues on the account.

  5. Ask the DISCOM for a feasibility answer and a works estimate for the figure you want.

  6. Plan the step-down for when the peak is under control.


The full set of contract demand rules, with regulation numbers, is in our Supply Code reference.