top of page
The Storage Brief. Battery rules, made plain.
Every week, one Indian rule, tariff or report, and what it means for a business battery order. A straight answer first, the numbers worked out, the sources linked. New here? Use the 30-second rule check to see which rules apply to your site.
Sections: Rules · Bills & backup · Prices & subsidies · Finance & tenders · Market


When is a storage project 'commissioned'? CERC's draft grid code
The Central Electricity Regulatory Commission (CERC) has proposed changes to the Indian Electricity Grid Code that set out how storage projects run trial operations, and when they may sell power before commercial operation.
Vaultus
Sep 144 min read


CEA draft: new solar and wind plants may need batteries from July 2027
A draft issued by the Central Electricity Authority (CEA) on 3 September 2026 would require new ground-mounted solar and onshore wind plants commissioned after 1 July 2027 to include batteries of at least 10% of plant capacity for two hours, rising to four hours from July 2029.
Vaultus
Sep 74 min read


New wind and solar lose softer deviation rules: where batteries fit
From 31 August 2026, the Central Electricity Regulatory Commission's (CERC) amended deviation rules put future wind and solar sellers on the same footing as other generators.
Vaultus
Aug 314 min read


Open access and grid access in 2026: what business buyers face
A business with a contract demand of 100 kW or more can buy green power through open access and bank surplus units within the month, and we found no change to those central terms in 2025-26.
Vaultus
Aug 276 min read


Karnataka: battery, diesel and solar rules for business sites
A business site in Karnataka faces four state rules beyond the national ones: a time-of-day tariff, a floor on billed demand, new rooftop solar rules and open access rules for bought-in green power. The biggest is the time-of-day tariff.
Vaultus
Aug 195 min read


Andhra Pradesh: battery, diesel and solar rules for business sites
A business site in Andhra Pradesh faces five state rules on batteries, solar and power prices, on top of the national ones. The one every site feels is the time-of-day tariff, which the Andhra Pradesh Electricity Regulatory Commission (APERC) kept unchanged for 2026-27.
Vaultus
Jun 305 min read


Telangana: battery, diesel and solar rules for business sites
A business site in Telangana faces four state rules beyond the national ones, and the biggest is the time-of-day tariff on high-tension (HT) bills. Since 1 April 2026, HT sites pay ₹1.50 a unit extra from 6 to 10 am and 6 to 10 pm, and ₹0.50 less from 10 am to 6 pm.
Vaultus
Jun 255 min read


Power market coupling draft: one price for all India's exchanges?
Yes, in its draft form. The Central Electricity Regulatory Commission's (CERC) proposed amendment, reported on 21 April 2026, would have the national grid operator pool bids from every power exchange and clear them together.
Vaultus
Apr 204 min read


CEA battery standards: 80% health at year 10 is the new floor
The Central Electricity Authority's (CEA) new technical standards, reported as issued on 14 April 2026, add a chapter on battery storage.
Vaultus
Apr 134 min read


CEA battery safety rules: what changes for storage from April 2027
The Central Electricity Authority (CEA) has added a battery storage chapter to India's electrical safety regulations, reported as gazetted on 30 March 2026 and taking effect on 1 April 2027.
Vaultus
Mar 306 min read


Time-of-day tariffs for businesses by April 2027? What the draft says
Possibly. A Ministry of Power draft issued on 12 March 2026 proposes that commercial and industrial users above 10 kW move to time-of-day tariffs no later than 1 April 2027. Peak-hour energy charges would be at least 1.2 times the normal rate and solar-hour charges at least 20% lower.
Vaultus
Mar 94 min read


Captive power rules from 13 March 2026: what changes for site solar
The Electricity (Amendment) Rules, 2026, in effect from 13 March 2026, make captive and group captive solar more predictable, which makes a site battery easier to plan.
Vaultus
Mar 24 min read
bottom of page